One of the features of the New APAC System is its adaptability. If you want to cover existing 10mm or 15mm pipework, and there is a maximum spacing of the pipework (approx. 55mm) then follow the simple guidelines shown  to give a neat and tidy finish.

Click here to view our ‘How to cover existing pipework.pdf’

Back to News